Retail Interior Demolition Tustin, CA
After-Hours Retail Flooring Removal at Micro Center in Tustin
SoCal Removal completed a focused floor-removal project around the Dell display area at Micro Center in Tustin. Night work accommodated store operations while the scope combined existing floor covering and adhesive removal, general cleanup and black rubber trim beneath the display cabinetry.

- Location
- Tustin, California
- Client
- Micro Center
- Completion
- March 16, 2025
- Work window
- After store closing
Verified Project Photography
Work from the field
The selected photographs show the original display flooring, protected equipment during work, exposed floor after removal and the pre-work cabinet-edge detail.
Contractor Scope
Defined work and planning
This was a targeted removal and trim package within an operating electronics store. The work centered on the existing display-floor area and the adjacent cabinetry, with planning around the store’s closing schedule.
- Remove the designated floor covering and adhesive around the display cabinetry.
- Protect surrounding technology displays and work around retained fixtures.
- Perform the planned work after closing, planned with store personnel.
- Complete general cleanup of the affected floor area.
- Install black rubber trim beneath the Dell display cabinetry.
Execution
Working around an active retail operation
Micro Center and SoCal Removal arranged a Sunday evening work window after store closing. The completion email dated March 17 confirms that the floor work was finished the previous night as scheduled. The finished scope combined removal, cleanup and cabinet trim; it did not include replacement of the entire store floor.