Southern California Contractor Portfolio

Demolition, Abatement & Renovation Projects

Explore SoCal Removal projects across Orange County and Southern California, from residential ceiling and flooring removal to commercial demolition, public-facility improvements and site preparation. Each case study explains the property, assigned scope and documented work, with photographs from the project.

CSLB#980451
ClassificationsA, B, C-21
CertificationsHAZ · ASB (ASB for bidding only)
Public WorksDIR #1000040690
CoverageSouthern California | Statewide capability

Find Relevant Experience

Experience for your property and project team

Owners & Developers

Structure removal, debris cleanup, abatement planning, and site preparation for properties moving toward sale, redevelopment, repair, or new construction.

General Contractors

Defined demolition, abatement, and early-phase scopes with attention to access, sequencing, disposal, protection, and schedule impacts.

Public Agencies

Licensed, DIR-registered contractor support for documented public-facility, campus, right-of-way, and municipal improvement work.

Adjusters & Facility Managers

Responsive demolition, damage repair, board-up, debris removal, and regulated-material planning for active facilities and insurance-related work.

Portfolio Archive

Additional project experience by service category

Featured case studies are shown above. Use the filters to review the remaining approved project examples, then open the case studies for scope, project conditions, photographs, contractor planning, and outcome details. Independent qualified parties perform surveys, testing, design, monitoring, inspections, or clearance when required.

Abajian Enterprise dba SoCal Removal CSLB #980451 Classifications A, B, C-21 Certifications HAZ · ASB (ASB for bidding only) Southern California with statewide capability for suitable projects

Filter by project category

52 projects shown.

Three-story structure demolition in Big Bear Lake
Structural Demolition & Site Preparation Redevelopment

Big Bear Lake Structural Demolition & Site Preparation

Big Bear Lake, CA 2018–2019

Full removal of a multilevel wood-frame structure and foundations, followed by crawl-space backfill and rough grading under winter mountain conditions.

Scope
Multilevel wood-frame structure and foundation removal, crawl-space backfill and rough grading.
Site conditions
Winter mountain conditions.
Structural Demolition & Site Preparation Redevelopment Debris Removal
View Project
Steel boiler tank dismantling at the Hampton Inn in Anaheim
Steel Tank Removal Commercial Facilities

Hampton Inn Anaheim Steel Boiler Tank Removal

Hampton Inn, Anaheim, CA 2019

Segmented dismantling and removal of two 5,000-gallon steel boiler tanks from a restricted-access mechanical area at the Hampton Inn in Anaheim, CA. A difficult project: heavy mineral deposits on the interior of the steel tanks made torch cutting slow and demanding.

Scope
Segmented dismantling and removal of large steel hot-water tanks.
Access planning
Restricted mechanical area with planned ventilation and material handling.
Steel Tank Removal Commercial Facilities Site Preparation
View Project
Elevated view of the CAT 973C track loader and commercial structures at 1280 South Anaheim Boulevard before demolition.
Demolition & Site Preparation Municipal Redevelopment

Commercial and Industrial Demolition & Site Preparation – Anaheim

Anaheim, CA 2025–2026

Approximately 10,500 square feet of structures were removed from a former commercial and industrial flex property at 1280 S. Anaheim Boulevard, preparing the City-owned site for future improvement.

Scope
Removal of approximately 10,500 SF of structures at 1280 S. Anaheim Boulevard.
Result
City-owned site prepared for future improvement.
Demolition & Site Preparation Municipal Redevelopment Public Works Site Preparation
View Project
Completed municipal office corridor with new flooring, painted walls, wall base and refinished doors.
Public Facility Renovation Municipal Public Works

Santa Ana City Hall Sixth-Floor Office Renovation

Santa Ana, CA

SoCal Removal delivered a 6,600-square-foot municipal office improvement with new flooring and corridor finishes, office reconfiguration, a rebuilt warming kitchen and copy-room work. Regulated-material activities were sequenced before affected construction.

Scope
6,600 SF of office improvements: flooring, corridor finishes, reconfiguration, warming kitchen and copy-room work.
Sequencing
Regulated-material activities preceded affected construction.
Public Facility Renovation Municipal Public Works Public Works Planning
View Project
Completed Irvine Valley College A311 rehearsal studio with new modular carpet tile and finished wall openings connecting adjacent music rooms.
Occupied-Campus Renovation Institutional Education

Irvine Valley College A300 Swing Space Renovation

Irvine, CA 2024

A 16-calendar-day renovation in an occupied college building created two new openings connecting three music spaces, with controlled demolition, framing, finish work, flooring, and building-system planning.

Scope
Two new openings linking three music spaces, with demolition, framing, finishes and systems planning.
Delivery
16 calendar days in an occupied college building.
Occupied-Campus Renovation Institutional Education Occupied Facility Planning
View Project
Completed Wilshire Square neighborhood entry monument in Santa Ana with stone masonry, brick cap, nameplate and raised lettering.
Municipal Repair & Refurbishment Neighborhood Improvements

Neighborhood Entry Monument Refurbishments – Santa Ana

Santa Ana, CA 2024

City-issued public-works assignments included refurbishment of four Pacific Park monuments and Wilshire Square monument reconstruction and lettering work, with custom components, right-of-way controls, cleanup, and inspection planning.

Scope
Four Pacific Park monument refurbishments plus Wilshire Square reconstruction and lettering.
Field planning
Custom components, right-of-way controls, cleanup and inspections.
Municipal Repair & Refurbishment Neighborhood Improvements Public Works Planning
View Project
Demolition crew dismantling the office and cashier booth at the Bruce Metals property in Santa Ana.
Commercial Demolition Commercial Property

Bruce Metals: Office and Shed Demolition in Santa Ana

Santa Ana, CA 2026

SoCal Removal arranged the demolition and removal of an approximately 400-square-foot office/cashier booth and an approximately 200-square-foot wooden shed at Bruce Metals in Santa Ana. The contracted work included structure removal, debris load-out, hauling and disposal.

Scope
Approximately 600 SF of office/cashier-booth and shed demolition, with load-out, hauling and disposal.
Closeout
Completed demolition documented February 2, 2026.
Commercial Demolition Commercial Property Site Preparation
View Project
Existing living area — February 23, 2026 at Laguna Woods.
Asbestos Cleanup Residential Property

Procedure 5 Asbestos Cleanup in Laguna Woods

Laguna Woods, CA 2026

SoCal Removal’s Cal/OSHA DOSH-registered abatement subcontractor performed a Procedure 5 asbestos cleanup at a vacant Laguna Woods residence. The documented scope combined limited material removal, contents handling and approximately 3,500 square feet of surface cleaning, followed by independent visual inspection and air sampling.

Scope
Vacant residence: subcontracted Procedure 5 cleanup; ~500 SF drywall, ceiling debris and shower liner removal; ~3,500 SF surface cleaning.
Project setting
Residential Property
Asbestos Cleanup Residential Property Asbestos Environmental Scope
View Project
Existing mezzanine and staircase at BlackHawk Industrial.
Industrial Demolition Industrial Warehouse

BlackHawk Industrial Steel Mezzanine Removal in Tustin

Tustin, CA 2024

SoCal Removal completed the removal of an approximately 700-square-foot steel mezzanine and its staircase at BlackHawk Industrial in Tustin. The scope included grinding anchors flush with the concrete slab and arranging material handling within the existing warehouse.

Scope
~700 SF steel mezzanine and staircase dismantled, anchors ground flush; active warehouse, client-provided forklift.
Project setting
Industrial Warehouse
Industrial Demolition Industrial Warehouse Site Preparation
View Project
Display flooring before removal at Micro Center.
Retail Interior Demolition Occupied Retail

After-Hours Retail Flooring Removal at Micro Center in Tustin

Tustin, CA 2025

SoCal Removal completed a focused floor-removal project around the Dell display area at Micro Center in Tustin. Night work accommodated store operations while the scope combined existing floor covering and adhesive removal, general cleanup and black rubber trim beneath the display cabinetry.

Scope
Floor covering and adhesive removed at the Dell display area; rubber trim installed; one night after store closing.
Project setting
Occupied Retail
Retail Interior Demolition Occupied Retail Occupied Facility Site Preparation
View Project
Existing library interior and ceiling conditions at Bandini Library.
Abatement & Interior Removal Public Library Renovation

Bandini Library Abatement and Interior Demolition in Commerce

Commerce, CA 2024

SoCal Removal managed a defined abatement and interior-demolition package for the Bandini Library renovation in Commerce. Work under the prime contractor included designated interior finishes and mold-related material removal, with a specialist abatement subcontractor performing the field scope.

Scope
Designated interior finishes and mold-related material removed by specialist subcontractor under prime contractor work order.
Project setting
Public Library Renovation
Abatement & Interior Removal Public Library Renovation Mold Environmental Scope
View Project
Interior corridor protected with plastic sheeting and taped barriers over exposed subfloor.
Lead-Related Removal & Selective Demolition Residential Renovation

Dana Point Lead-Related Tile and Wall Removal

Lantern Village, Dana Point, CA 2024

SoCal Removal held the customer-facing contract and a qualified abatement subcontractor for designated tile, floor-trim, and painted-wall removal after a limited renovation-area survey identified lead-based coatings on selected components.

Scope
Designated tile, trim, plaster, and drywall removal based on a limited renovation-area survey.
Outcome
Selected assemblies were opened and protected areas were prepared for the next renovation phase.
Compliance Note
Independent qualified parties performed the environmental survey and laboratory analysis. Clearance was obtained by the project owner.
Lead-Related Removal & Selective Demolition Residential Renovation Lead Environmental Scope
View Project

Related Capabilities

Connect project experience to the service you need

Project Intake

Send enough information for a useful first review

Send the available plans, surveys, photographs, specifications, schedule requirements, site information, insurance details, or bid documents. SoCal Removal will review the contractor scope, access, disposal, regulated-material considerations, sequencing, and schedule before pricing is confirmed.

  • Plans, specifications, scope notes, and defined work limits
  • Available asbestos, lead, mold, or hazardous-material reports
  • Current photographs, access constraints, occupancy, and staging information
  • Bid date, target start, working hours, phasing, and schedule constraints

This site is protected by reCAPTCHA.