Asbestos Cleanup & Site Restoration
Tustin MCAS Hangar Fire Asbestos Cleanup and Yard Restoration
Residential asbestos cleanup and exterior restoration addressing collateral impacts from the Tustin MCAS North Hangar fire.

- Location
- Tustin, Orange County, California
- Project setting
- Residential Property
- Primary service
- Asbestos Cleanup & Site Restoration
- Documented
- May 2024
- Side yard restored
- Approx. 5 × 30 ft
The homeowner hired Andre Abajian and SoCal Removal to handle exterior cleanup and property restoration, with asbestos cleanup by a Cal/OSHA DOSH-registered abatement subcontractor, at a residence in Tustin, Orange County, California, following the November 2023 Tustin MCAS hangar fire. The project combined a defined exterior cleanup scope, specialist abatement resources and subsequent side-yard restoration. The geotextile fabric and aggregate shown in the photographs represent the restoration portion of a broader environmental cleanup assignment.
The Tustin MCAS North Hangar fire
The November 7, 2023 fire involved the North Hangar, also known as Hangar 1, at the former Marine Corps Air Station Tustin. The site has deep ties to Orange County's military history: it was commissioned in 1942 for Navy blimp operations and later served Marine Corps helicopter aviation before closing in 1999. The City of Tustin now identifies the former base's redevelopment as Tustin Legacy. City of Tustin: MCAS history.
The two enormous timber hangars became recognizable local landmarks. The City describes them as approximately 17 stories high, more than 1,000 feet long and 300 feet wide; their engineering significance was recognized by the American Society of Civil Engineers in 1993. The North Hangar fire therefore affected both a historic structure and the surrounding community. City of Tustin: the hangars.
Collateral damage: residential cleanup beyond the hangar site
The aftermath extended beyond the hangar footprint. Orange County reported asbestos in tested fire debris, while the City of Tustin documented residential debris investigations and mitigation in surrounding neighborhoods. Those public findings explain the broader incident; the assigned work at an individual property still depends on that property's scope and technical evaluation.
This case study concerns the collateral cleanup and restoration needs at a Tustin residence following the MCAS hangar fire. The homeowner retained Andre Abajian and SoCal Removal for an exterior assignment encompassing roof and gutter surfaces, fountains, walkways, planting areas and a narrow side yard. The property required a planned scope connecting environmental cleanup with the replacement of removed landscape surface materials.
Exterior asbestos-cleanup scope
The project estimate and exterior work order document the different surfaces and materials included in the assignment:
- Roof and gutters: cleaning assigned roof surfaces and removing debris from rain gutters.
- Two backyard fountains: pumping out the two fountains, removing accumulated debris and cleaning the fountain features.
- Entry walkway: HEPA vacuuming the approach to the front door.
- Side-yard surface materials: removing existing crushed rock and a limited layer of surface soil within the designated work area.
- Planting beds and landscape areas: specified surface-soil and ground-cover removal around exterior walkways, front and rear flower beds, and trees, including mulch around a magnolia tree.
- Exterior surfaces: cleaning assigned trees, yard surfaces and the backyard wood patio.
- Windows and screens: discarding specified window screens and wet cleaning exterior windows and sill surfaces.
The March 2024 exterior scope records distinguish the assigned work areas and methods. The estimate identifies a side-yard area approximately five feet wide by thirty feet long; the specialist work order calls for three abatement technicians, cleaning seven trees and both fountains, and approximately one to two inches of surface-soil removal in assigned areas. These are documented scope quantities, rather than a claim of independently measured final removal volumes.
Organizing several cleanup tasks at one residence
A roofline, a fountain, a planted area and a pedestrian walkway each present different access and material-handling conditions. The project required a scope that identified those separate tasks and connected them to the overall exterior assignment. Roof and gutter access, retained landscaping, existing equipment and the route around the home were practical planning considerations.
Project records include successive exterior estimate revisions and a specialist work order. Those documents identify the cleanup areas, removal tasks and personnel assignment. This level of scope definition matters when a residential cleanup involves several surfaces and a later restoration stage.
Side-yard restoration with fabric and aggregate
Removal of the existing ground-cover material left a separate restoration task: establishing the replacement surface around the home's retained features. SoCal Removal installed geotextile fabric and aggregate in the designated side yard as part of that follow-on work.
The photographs show the narrow exterior corridor, equipment beside the building and the established stepping surfaces. The completed aggregate placement fits around those features. The sequence connects removal and preparation with a defined finish for the area.
Working within that corridor required attention to usable access and equipment service space. For a similar assignment, finished elevations, material selection and the limits of the replacement surface should be defined before installation. An aggregate finish does not replace a property-specific cleanup evaluation or an engineered drainage design where one is needed.
Cleanup planning and independent technical services
SoCal Removal's project file includes Procedure 5-related planning and correspondence, along with the exterior cleanup estimate and work order. The exterior assignment described here is supported by those scope records and the owner's confirmation of the hangar-fire cleanup connection. The gallery documents the side-yard restoration stage.
Regulated asbestos work is assigned to appropriately licensed specialist resources and, where required, Cal/OSHA DOSH-registered employers. Independent qualified parties provide testing, technical evaluation and any required clearance. These responsibilities are distinct from the contractor's planning of access, removal, handling and restoration.
Tustin and Orange County asbestos-cleanup projects
This project brings together two connected contractor services: subcontracted asbestos cleanup and restoration of the affected exterior area. A useful plan addresses both the assigned cleanup and the condition in which the owner wants the property returned.
For a Tustin or Orange County property review, provide available consultant reports, cleanup plans, photographs, access information and the desired restoration finish. SoCal Removal can review removal limits, assigned waste handling, sequencing and site-restoration needs, then identify the information required for a defined proposal.
Project photographs
Open a photograph for a closer view of the work.
From our project records
Discuss your scope
Plan your next project with SoCal Removal
Send photographs, available plans and reports, the project city and your desired schedule. Andre Abajian and the SoCal Removal team can review the work and identify the information needed for a useful scope.
Abajian Enterprise dba SoCal Removal · CSLB #980451