Modular Structure Removal Irvine, CA
University of California, Irvine (UCI) North Campus Modular Structure Removal
Removal of a modular structure while preserving an active fiber-optic line and separating steel for recycling.

- Location
- Irvine, CA
- Service
- Modular Structure Removal
- Setting
- Institutional Education
- Structure removed
- One 40-ft modular unit
- Documented media
- 7 photographs
Original Project Photography
Work from the field
The verified historic carousel documents modular-building dismantling, frame separation, debris handling, and final site work.

Steel separation

Frame reduction
Contractor Scope
Defined work and planning
Removal of a modular structure while preserving an active fiber-optic line and separating steel for recycling.
- Asbestos testing and air-district notification completed before demolition began.
- Selective dismantling of wood-frame components and flooring using an excavator with a thumb attachment.
- Cutting of the steel trailer-style frame, with scrap metal separated from waste for recycling.
- Debris handling, hauling, and disposal in accordance with documented project requirements.
- Final cleaning of the contractor work area.
Project Planning
Work was sequenced around site access, the protected utility line, available project documentation, and applicable notification and disposal requirements. Independent qualified consultants and laboratories remain responsible for testing, analysis, and other professional environmental services when required; regulatory notifications remain the responsibility of the party identified in the project documents.
Discuss Your Scope
Planning modular-building removal around active campus infrastructure?
Send the available plans, surveys, photographs, schedule requirements, and site information so our team can evaluate the contractor scope.



