Modular Structure Removal Irvine, CA

University of California, Irvine (UCI) North Campus Modular Structure Removal

Removal of a modular structure while preserving an active fiber-optic line and separating steel for recycling.

Tracked excavator sorting wood, insulation and metal debris with workers nearby.
The excavator sorts mixed building components while the project team manages the surrounding work area.
Location
Irvine, CA
Setting
Institutional Education
Structure removed
One 40-ft modular unit
Documented media
7 photographs

Original Project Photography

Work from the field

The verified historic carousel documents modular-building dismantling, frame separation, debris handling, and final site work.

Contractor Scope

Defined work and planning

Removal of a modular structure while preserving an active fiber-optic line and separating steel for recycling.

  • Asbestos testing and air-district notification completed before demolition began.
  • Selective dismantling of wood-frame components and flooring using an excavator with a thumb attachment.
  • Cutting of the steel trailer-style frame, with scrap metal separated from waste for recycling.
  • Debris handling, hauling, and disposal in accordance with documented project requirements.
  • Final cleaning of the contractor work area.

Project Planning

Work was sequenced around site access, the protected utility line, available project documentation, and applicable notification and disposal requirements. Independent qualified consultants and laboratories remain responsible for testing, analysis, and other professional environmental services when required; regulatory notifications remain the responsibility of the party identified in the project documents.

Discuss Your Scope

Planning modular-building removal around active campus infrastructure?

Send the available plans, surveys, photographs, schedule requirements, and site information so our team can evaluate the contractor scope.

This site is protected by reCAPTCHA.