Steel Tank Removal Hampton Inn, Anaheim, CA
Hampton Inn Anaheim Steel Boiler Tank Removal
Segmented dismantling and removal of two 5,000-gallon steel boiler tanks from a restricted-access mechanical area at the Hampton Inn in Anaheim, CA. A difficult project: heavy mineral deposits on the interior of the steel tanks made torch cutting slow and demanding.

- Location
- Hampton Inn, Anaheim, CA
- Service
- Steel Tank Removal
- Setting
- Commercial Facilities
- Documented
- September 2019
- Documented media
- 14 photographs · 1 video
Original Project Photography
Work from the field
The preserved field sequence documents large steel-tank dismantling, sectional removal, material handling, and cleanup inside a restricted mechanical area.
Contractor Scope
Defined work and planning
Segmented dismantling and removal of two 5,000-gallon steel boiler tanks from a restricted-access mechanical area at the Hampton Inn in Anaheim, CA. A difficult project: heavy mineral deposits on the interior of the steel tanks made torch cutting slow and demanding.
- Work-area staging and removal-route planning within the restricted-access space.
- Sequenced torch cutting and segmented dismantling of the two 5,000-gallon steel boiler tank shells and their steel components, working through heavy mineral deposits built up on the interior of the tank walls.
- Planning of ventilation, fire-prevention, and material-handling requirements within the contractor work plan.
- Loading and off-site hauling of removed steel and associated debris.
Project Challenges
This was a difficult project. Heavy mineral deposits had built up on the interior of the steel tank walls, and cutting through that scale with a torch was slow, demanding work compared with cutting clean steel. The tanks were also wrapped in flammable insulation and sat in a small, high-ceiling utility room with minimal airflow, so the crew worked with ducted high-CFM blower fans, strict control of ignition sources, and careful handling of sharp metal edges under high-heat conditions.
Planning
Work was sequenced around limited airflow, equipment access, facility operations, ignition sources, component handling, and the removal route. Project-specific ventilation, hot-work, fire-prevention, shutdown, inspection, and approval responsibilities were planned with the parties identified in the project documents. Independent engineers and inspectors remained responsible for their respective professional services when required.
Original Project Videos
Project work in motion
Project footage documents sectional tank dismantling, equipment setup, and material handling.