SoCal Removal delivered a 6,600-square-foot municipal office improvement with new flooring and corridor finishes, office reconfiguration, a rebuilt warming kitchen and copy-room work. Regulated-material activities were sequenced before affected construction.

Completed municipal office corridor with new flooring, painted walls, wall base and refinished doors.
Completed corridor with new flooring, wall base, paint and refinished doors.
Location
Santa Ana, California
Owner
City of Santa Ana
Project
25-9002
Flooring scope
Approx. 6,600 SF

Verified Project Photography

Work from the field

Project photographs follow the work from existing conditions through framing and completed finishes.

Contractor Scope

Defined work and planning

Work combined selective demolition, interior construction, finish replacement, environmental planning and public-works administration in an occupied municipal building.

  • Subcontracted the lead- and asbestos-abatement work identified in project reports, completed before affected construction activities.
  • Removed and replaced approximately 6,600 square feet of carpet and LVT in offices, corridors, the kitchen and copy room.
  • Removed designated wallcovering, repainted corridors, replaced wall base and blinds, and refinished doors.
  • Rebuilt the warming kitchen and copy room with new casework, countertops, fixtures, appliances, flooring and finishes.
  • Constructed office separations and related electrical, data and furniture work.
  • Managed the schedule, submittals, RFIs, inspections, labor compliance, progress billing, bonding, warranty and closeout.

Execution

Execution in an active municipal building

Work was phased around building operations, environmental prerequisites, retained furniture, trade access, inspections and City documentation. Planned sequencing kept demolition, framing, finishes, building systems and closeout moving under one project plan.

Project Video

Project Walkthrough

Field video showing renovation activity and completed finishes.

Discuss Your Scope

Planning a public-facility renovation?

Send the available plans, surveys, photographs, schedule requirements, and site information so our team can evaluate the contractor scope.

This site is protected by reCAPTCHA.