Company safety program

Our Safety Program

Safety on our projects runs on written programs, trained crews, a qualified person in charge of every job and records an owner or GC can review.

Track record

Figures as reported for prequalification. Supporting documents are available on request.

On every project

  1. PlanReview surveys, plans and site conditions, and set the control for each hazard before mobilization.
  2. SuperviseA qualified person with authority to stop work is on site; demolition starts only after a written structural survey.
  3. InspectToolbox meetings at least every 10 working days, and site checks as work proceeds and after any change.
  4. RecordSigned meeting sheets, inspections, training records and changed-condition decisions.
Read the detailed planning guidanceConcise, source-grounded project considerations

Written programs

Our Injury and Illness Prevention Program includes a Code of Safe Practices for demolition and site work. It is backed by a Heat Illness Prevention Plan for outdoor sites and indoor work areas, a Hazard Communication program with a chemical inventory and safety data sheets, a respiratory protection program with fit testing and medical evaluation, and lead compliance procedures for work that disturbs lead-containing paint or coatings.

Training and certification

Every worker gets a site orientation before the first shift: the hazards on that job, the controls in place, emergency procedures and who to report to. Task training covers heat illness, hazard communication, respiratory protection, fall protection and equipment safety. Lead work is performed by CDPH-certified personnel, and the firm holds EPA Renovation, Repair and Painting certification.

Specialty vendors

Asbestos abatement and other specialty work is performed by licensed, registered vendors under annual service agreements, working under our supervision and site rules. Their safety documents are collected before they mobilize.

Records available for prequalification

On request we send our IIPP, EMR letter, training and certification records, toolbox meeting records, certificates of insurance and safety data sheets for products used on your project. Licensing, registration, insurance and bonding details are on our Qualifications page.

Primary references

Requirements can depend on the task, employer, location, project documents and actual field conditions.

SoCal Removal is a licensed demolition and environmental contractor—not an industrial hygienist, testing laboratory, engineer, attorney or regulatory agency.

Prequalifying a contractor? Start with the documents.

Tell us the project and the forms your agency or GC uses, and we will send the safety records that match.

Send us

  • Prequalification form or checklist
  • Project name and owner
  • Safety documents you require

We review

  • Records to send
  • Insurance and bonding requirements
  • Site-specific safety plan needs
Get a Quote Include the project address and desired start date.