Our work in Costa Mesa

Costa Mesa projects we have completed:

Demolition in Costa Mesa

In Costa Mesa we demolish college and commercial buildings, older homes and accessory structures, and we salvage what has value before the building comes down. The city’s demolition submittal asks for a detailed site plan, so we lay out which buildings go, which stay, where the sewer is capped and which utilities are terminated before we apply.

Our crews work daylight hours, inside Costa Mesa’s allowed construction hours. When a store, office, campus or care facility needs to stay open, we offer after-hours and phased work where the city allows it.

What a demolition permit in Costa Mesa requires

Demolition permits are issued by the Building Safety Division of Economic & Development Services through the city’s TESSA portal. The city’s demolition submittal requirements include:

  • The South Coast AQMD notification number before the permit is issued
  • Plans at least 24 by 36 inches
  • A site plan showing buildings to be removed and to remain, the sewer cap location, which water, gas and electric lines stay or are terminated, and the power pole
  • An erosion and sediment control plan naming the BMPs
  • Owner contact information

Whole-building demolitions also go to Engineering when demolition cost is $10,000 or more. Costa Mesa requires 65% of debris to be recycled and 100% of asphalt, concrete, soil and land-clearing debris, with weight tickets due before final inspection (city C&D requirements).

Self-hauling debris requires a Contractor Self-Haul Permit, and using a hauler that is not on the city’s list costs three times the project fee.

Permit rules on this page were checked against city sources in October 2026 and are re-checked every six months.

Utilities and sewer capping in Costa Mesa

Mesa Water serves most of Costa Mesa and Irvine Ranch Water District serves the rest. Sewer is handled by the Costa Mesa Sanitary District. A small part of the city is in the coastal zone, where the California Coastal Commission issues coastal permits; we check every address.

Site preparation in Costa Mesa

After demolition we clear the site, remove slabs and paving, place base and rough grade, as we did at Orange Coast College.

  • Pool removal. If the area will stay open space, the shell may stay: two 36-inch drain holes, 12 inches of drain rock, the coping and bond beam removed at least 18 inches below grade, and sand or clean fill in 6-inch lifts topped with planting soil. The owner signs that the area stays open space, acknowledges settlement risk and agrees to disclose it on sale. To build over the area later, the full shell comes out and the fill is engineered and compacted with a geotechnical report (city pool demolition standard).
  • Cal/OSHA on pool removals. When the pool shell comes out and the hole is 5 feet or deeper, it is an excavation under Cal/OSHA, and the contractor needs a Cal/OSHA Trench/Excavation permit, permit type T1 on the Cal/OSHA application, before anyone goes in (8 CCR 341, Cal/OSHA form 41-1). We pull a T1 project permit for the job and designate a competent person for each project, as the permit requires. Excavations 5 feet or deeper must be sloped, benched or shored unless they are entirely in stable rock (8 CCR 1541.1), and a competent person inspects the excavation daily and after every rain. We keep broken concrete and spoil at least 2 feet from the edge, provide a ladder or ramp within 25 feet of travel, barricade the open pit and keep crews out of standing water (8 CCR 1541), and we call DigAlert at least two working days before digging (CSLB). Breaking the shell with jackhammers falls under Cal/OSHA’s silica standard, so we use water at the point of impact or shrouded dust collection under a written exposure control plan (8 CCR 1532.3).
  • Grading. Costa Mesa lowers the county’s exemptions for shallow and planter fill to 20 cubic yards per lot and still requires a compaction report (CMMC Title 5).
  • Bins. A bin in the street needs a $40 Public Works permit, good for two weeks; bins on private property need none (temporary bin permits).
  • Trucks. Vehicles over 10,000 pounds must stay on designated truck routes except to deliver to permitted work (CMMC 10-248).

On every Costa Mesa site we control dust under South Coast AQMD Rule 403: water on the work, no visible dust past the property line and track-out cleaned up daily. More on site preparation, concrete removal, grading and utility locating.

Abatement in Costa Mesa

Abatement means removing what makes a property unsafe, unpermitted or unusable. Owners usually call us after a city notice of violation, before a sale, or before a rebuild.

  • Unpermitted additions and structures: enclosed patios, garage conversions, sheds and rooms built without permits, removed under a demolition permit so the property matches its approved plans again.
  • Damaged and unsafe buildings: fire-, storm- or impact-damaged structures secured with board-up and fencing, then taken down.
  • Rubbish and abandoned items: junk, debris piles, old appliances and leftover building materials loaded, hauled and recycled.
  • Hazardous substances: under our CSLB HAZ certification we remove contaminated soil and abandoned fuel and holding tanks.
  • Brush and old pools: weeds and brush cut for fire clearance, and unused pools removed by the method the city requires.

See hauling and disposal, land clearing and hazardous materials prices.

Asbestos abatement before demolition in Costa Mesa

Most Costa Mesa housing is more than 30 years old, according to the city housing element, so acoustic ceilings, floor tile and joint compound often test positive. Our Costa Mesa work includes asbestos acoustic ceiling texture removal, with the ceiling prepared for new finishes.

In Costa Mesa homes and commercial buildings the abatement work most often covers acoustic ceilings, floor tile mastic, drywall joint compound and HVAC duct wrap.

Every job starts with a survey by an independent Certified Asbestos Consultant and accredited-lab results. You can hire the consultant directly, or we bring one in and include the fee in our estimate. When the survey finds asbestos, a separately licensed asbestos abatement contractor registered with Cal/OSHA (DOSH) removes it under subcontract to SoCal Removal, following Cal/OSHA’s asbestos standard (8 CCR 1529) and South Coast AQMD Rule 1403: the work area contained, the material kept wet, and the waste bagged, labeled and hauled under a manifest. An independent consultant can run clearance air samples before the area is reopened, and we schedule the demolition around that work.

Illustration of Cal/OSHA Class I asbestos work: full containment, negative air with HEPA filtration and a three-stage decontamination unit
Illustration. Cal/OSHA Class I work: friable material such as popcorn ceiling texture, pipe insulation and fireproofing, removed inside full containment. On our projects, asbestos abatement is performed by a Cal/OSHA-registered subcontractor.

Every demolition in the South Coast air district, including Costa Mesa, needs the asbestos survey and an AQMD notification 10 working days before work starts, even when no asbestos is found (Rule 1403). For lead, SoCal Removal is an EPA RRP lead-certified firm and removes lead-based paint, lead-glazed tile and coated components as part of renovation and demolition, using lead-safe work practices. When a project calls for lead abatement under California rules, that work is done by certified lead workers with the required controls, notifications and medical monitoring; our pollution coverage is listed on our qualifications page. See asbestos abatement, lead removal and testing prices.

Disaster recovery in Costa Mesa

Costa Mesa sits along the Santa Ana River levees inside FEMA flood zones, with mapped liquefaction zones and splays of the Newport-Inglewood Fault, and its bluffs have eroded in the past, according to the city’s draft hazard mitigation plan (hazard mitigation plan draft). The 1933 Long Beach earthquake damaged local businesses and the Main School. Wildfire is a smaller risk; the city adopted the state’s recommended fire hazard severity zones in June 2025 (Ordinance 2025-03).

After a fire, flood, landslide or vehicle impact, we secure the property first with board-up and temporary fencing. Then we remove damaged materials and debris and, once the owner, insurer and city agree on the scope, demolish what can’t be saved and clear the site for the rebuild. Nearby, we handled vehicle-impact demolition and repair at a Westminster storefront and fire-debris cleanup after the Tustin hangar fire.

After a disaster, inspectors may post a green Inspected, yellow Restricted Use or red Unsafe placard; only the building department can remove one, and a red placard is not a demolition order (Cal OES). Asbestos rules still apply after a disaster: South Coast AQMD requires an approved Procedure 5 plan before fire- or storm-damaged asbestos material is cleaned up, and when a government agency orders a dangerous building demolished, the notice is filed as an ordered demolition without the usual 10-working-day wait (AQMD Rule 1403 FAQ). Homeowner policies often include debris-removal coverage on top of the dwelling limit, commonly an extra 5% of Coverage A, so ask your adjuster (California Department of Insurance). See planning repairs after vehicle-impact damage.

What it costs in Costa Mesa

Our published 2026 prices are the same in Costa Mesa as everywhere else we work. City permit fees, the AQMD notification fee and any recycling deposit are extra; see demolition permit and AQMD fees by city.

  • House, garage or ADU demolition, collapse and remove with the slab left: $26.50–$31.50 per square foot
  • Full demolition to dirt, foundation and slab out: $42–$51 per square foot
  • Fire-damaged structure demolition, slab left: $29–$35 per square foot
  • Interior demolition and gut-outs: $22.50–$26.50 per square foot
  • In-ground pool removal, by the method the city requires: $15,750–$31,500
  • Concrete slab removal, 4 inches: $8.75–$10.50 per square foot ($6–$7.25 at 5,000 SF and up)
  • Lot clearing and grubbing: $22,000–$26,250 per acre
  • Rough grading: $1.35–$1.85 per square foot of pad
  • Asbestos popcorn ceiling abatement, by our registered subcontractor: $9.50–$12.75 per square foot
  • Asbestos floor tile and mastic abatement, by our registered subcontractor: $17–$23.50 per square foot
  • Asbestos sample, standard turnaround: $120–$145 per sample
  • Temporary 6-foot construction fence: $21–$25 per linear foot

Minimums are $3,750 for demolition and site preparation and $1,950 for asbestos or lead work. See the demolition, fire-damaged demolition, interior demolition, asbestos removal, popcorn ceiling, pool removal, land clearing and grading cost guides, or all 2026 prices.

Costa Mesa demolition and abatement questions

What does Costa Mesa require to demolish a building?

A Building Safety permit through TESSA with the AQMD notification number, a site plan showing utility terminations and the sewer cap, an erosion control plan, and a construction and demolition recycling plan. Larger demolitions also go to Engineering.

Does concrete from a Costa Mesa demolition have to be recycled?

Yes. Costa Mesa requires 100% diversion of asphalt, concrete, soil and land-clearing debris, and 65% of other debris. We haul to recyclers and keep the weight tickets.

Have you worked for public agencies in Costa Mesa?

Yes. At Orange Coast College we demolished the recycling center and handled salvage, site clearing, base placement and rough grading.

Can I leave the pool shell in place in Costa Mesa?

Only if the area stays open space. The city allows drain holes, rock and layered backfill with the shell left in place, but the owner must agree to disclose it on sale. To build over it, the whole shell must come out with engineered fill.

Do I need a permit for a dumpster in Costa Mesa?

Only if it sits in the street or public right-of-way. That needs a $40 Public Works permit, good for two weeks. Bins on private property need no permit.

Can asbestos acoustic ceilings be removed in Costa Mesa?

Yes. Our Cal/OSHA-registered abatement subcontractor removes the texture; on one Costa Mesa renovation the ceiling was then prepared for new finishes. Popcorn ceiling abatement runs $9.50–$12.75 per square foot, with a $1,950 minimum.

Start with the address and a few photos

Send the property address, photos, any asbestos survey and your target schedule. We walk the site, check the permit path for that parcel and send a written, itemized price. Call (949) 446-0000 or request a project review.

Nearby: Newport Beach · Huntington Beach · Santa Ana · All of Orange County